Main menu

Get in Contact!X

Privacy Policy
We are against Spam! For your secure supply of information please provide the following data.
Thank you for your cooperation!
I accept the general data protection regulations: GDPR

Helianthus annuus

Soraya

Sunflower
Item no. N0601
  • Annual

  • 10-12 weeks

  • 61″ / 155 cm

  • Sun

  • Raw

  • Cutflowers

N0601
Remember Recommend

Culture guide

  • Uses: Plants for bedding, cut flower production
  • Exposure: Sun
  • Garden height: 61″ / 155 cm
  • Crop time: 10-12 weeks
  • Sow time: Indoor forcing: March-August, sowing in intervals; Outdoor forcing: April-Mid July
  • Sowing method: 1-2 seeds per plug, sowing directly into field is recommended
  • Germination*: Field: 10-15 days at 15 °C, Greenhouse: Stage I: 5-10 days at 21-24 °C, Stage II: 5-8 days at 18-20 °C, Stage III and IV: 7-14 days at 15-17 °C, in media with low soluble salt levels and pH: 5.5-6.2. Cover seed with vermiculite, sand or substrate after sowing. Keep soil slightly moist but not wet. Field: sow the seeds 3-4 cm deep.
  • Growing On: Plant cut flowers in 5-10x40-70 cm space, approximately 30-35 plants per m².
  • Media: Field: Before sowing treat substrate with herbicide or fight the weeds mechanically and fertilize the field. Greenhouse: Use a well-drained, growing substrate with 15-30 % clay, 1-3 kg/m2 complete balanced fertilizer, 0-2 kg/m² slow release fertilizer
    (3-6 months), Fe-chelate, micronutrients, pH: 5.5-6.2.
  • Temperature: Field: cultivation is possible from April onwards. Grow at 15-18 °C. Cultivate flowering plants not below 12 °C. Helianthus plants do not tolerate frost.
  • Fertilization: Field: N min soil value: approximately 150 g/m². Greenhouse: High fertilization levels are required.
* Germination Stages (from seed to finished young plant)

Stage I Starts with the radicle breaking through the testa. The roots are touching the medium. Ends with fully developed cotyledons.
Stage II Starts from fully developed cotyledons. Ends with the fully developed true leaf or true leaf pair.
Stage III Starts from the fully developed true leaf or true leaf pair and ends with 80% of the young plants being marketable.
Stage IV All young plants are ready for sale and in the process of being hardened off. This stage lasts about 7 days.

The cultural recommendations are based on results from trials conducted under Central European conditions. Different conditions in other parts of the world may lead to deviations in results achieved.

We also recommend
  • S9410
    Kaleidoscope
    Pentas lanceolata